Topside lifting and rigging on Albatros offshore wind farm

The offshore substation at the EnBW Albatros offshore wind farm in the German North Sea has been installed by jack-up vessels Pacific Osprey and Innovation. Eager.one was asked to set up a topside lifting and rigging plan for the both the OTM TP and OTM.

Topside lifting and rigging

Swire Blue Ocean’s heavy lift jack-up installation vessel “Pacific Osprey”, was used to transport the topside and was loaded in Rotterdam. In the construction area, the DEME offshore’s jack-up vessel “Innovation” lifts the topside on to the OTM TP (transition piece).

 


Get your Topside lifts project execution supported!

With our extensive knowledge of lifting and transportation, we eliminate and manage risks. We have prepared numerous lifting and rigging plans. Feel free to contact us to discuss your upcoming projects.

CONTACT US

 

We are eager to hear from you

Call +31 (0) 30 240 80 60 or use the contact form. We always respond within 24 hours.

  • By submitting this form you agree with the privacy policy of Eager.one.
  • Dit veld is bedoeld voor validatiedoeleinden en moet niet worden gewijzigd.

You are not alone