The offshore substation at the EnBW Albatros offshore wind farm in the German North Sea, has been installed by the jack-up vessels Pacific Osprey and Innovation. Eager.one was asked to setup a lifting and rigging plan for the both the OTM TP and OTM.
Swire Blue Ocean’s heavy lift jack-up installation vessel “Pacific Osprey”, was used to transport the topside and was loaded in Rotterdam. In the construction area, the DEME Offshore’s jack-up vessel “Innovation” lifts the topside on to the OTM TP (transition piece).
With our extensive knowledge of lifting and transportation we eliminate and manage risks. We’ve prepared numerous lifting plans. Feel free to contact us.
WILCO
Senior Project Engineer
0031 30 240 80 60
Our 40 years of experience provides the basis of a successful start of your project: right from the FEED phase. Preparation is vital. Therefore our concept studies, method statements and mission equipment offer you all the support you need.
Our aim is to optimize your project team’s results. With our exclusive knowledge of lifting and transportation we eliminate and manage risks. This is how we reach our collective goal: Zero Accidents, Zero Incidents.
We have built up a great deal of experience with the design of (mobile) cranes and bespoke heavy equipment such as piling machines and excavators. Our customer base includes the most prominent producers of cranes and heavy machinery worldwide.